Registered Saudi establishment · Systems engineering house

We engineer the systems
behind your facility.

Surveillance, networks, access control and smart-building systems — designed, delivered to a written standard, then operated under a maintenance contract where every visit is documented with photographs and reports.

SurveillanceDesign & analytics
NetworksCabling & infrastructure
Access ControlGates & attendance
Smart BuildingsHomes & facilities
MaintenanceDocumented on a platform
RegisteredCR & VAT registered
AB-570Our internal 105-clause standard
800+ clientsSince inception — individuals & facilities
Own platformEvery contract and visit documented
What we do

Five engineering disciplines,
managed by one party.

What costs a facility most is dealing with one vendor for cameras, another for the network and a third for access control — so nobody owns what happens between the systems. We take responsibility for the whole thing: design, delivery and operation.

Surveillance & Video Analytics

Coverage designed from the site drawings and regulatory requirements — not guessed. Lens selection, pole positions and storage sized to the retention period you actually need.

  • Coverage study and camera position drawings
  • Analytics: line crossing, counting, dashboards
  • Central control room integration

Networks & Infrastructure

Structured cabling, equipment cabinets, containment and backup power — the layer that makes everything above it either work or fail.

  • Structured cabling and labelled schedules
  • Managed switching and enterprise Wi-Fi
  • Cabinets, earthing and UPS

Access Control & Security

Who entered, when, and with what authority — on a record you can go back to. Integrated with alarm and life-safety systems.

  • Gates, doors, card and biometric readers
  • Time attendance linked to HR systems
  • Alarm and life-safety integration

Smart Building Systems

Lighting, HVAC, shading and unified scenes — built on correct first-fix infrastructure, not wireless devices bolted on afterwards.

  • First-fix to the AB-570 standard
  • Central lighting and climate control
  • Villas and homes with programmed scenes

Compliance & Readiness

We prepare your facility for the authorities’ requirements and issue a readiness report showing what is compliant and what is missing — before the official visit.

  • Free readiness assessment and detailed report
  • Remediation of findings and re-inspection
  • Documents the authority can verify

Operation & Maintenance

The contract does not end at handover. Scheduled visits, before-and-after photo documentation, and reports that reach the owner without being chased.

  • Annual and semi-annual contracts
  • Visits documented on the platform
  • A tracking portal for every branch
How we work

Four phases — each with a written deliverable.

The difference between an engineer and an installer is that the first hands you a document you can review and hold them to. You receive a defined deliverable at each phase before we move to the next.

PHASE 01Study & Design

Site survey, drawing review, regulatory and operational requirements, then a design showing what will be installed, where, and why.

Deliverable → Position drawings + bill of quantities + coverage study
PHASE 02Delivery to a Standard

Execution follows the written AB-570 standard — containment, labelling, cable specification, testing — not on-site improvisation.

Deliverable → Installation report + stage photos + test results
PHASE 03Documented Handover

Handover includes the complete system file: what was installed, where, with what configuration, and how it is operated.

Deliverable → As-built file + operator training + warranty
PHASE 04Operation & Maintenance

A maintenance contract with scheduled visits documented on the platform, reports delivered automatically, and renewal alerts before expiry.

Deliverable → Periodic report + verifiable record
Intellectual property

AB-570 —
our written engineering reference.

Most defects in facility systems cannot be fixed without breaking the finishes, because the first fix was done without a reference. So we wrote our own standard: 105 clauses governing containment, cable specification, labelling, cabinet positions and testing — and every project we take on is delivered against it.

It is not an internal document only: we issue a readiness report against it, showing the owner their compliance clause by clause and what is missing before the official inspection arrives.

Note: AB-570 is an internal engineering and operating standard developed by Alpha Beta to govern its own delivery quality. It is not a government accreditation, nor a substitute for regulatory requirements — it is how we meet them and document that we did.

Read the standard Request a readiness report
Readiness report
AB-570 · Rev 1.1

Facility Readiness Report

Sample — not real data

Containment and cable specificationCompliant
Point labelling and documentationCompliant
Equipment cabinet and earthingCompliant
Backup power supplyFinding
Recording retention periodFinding
Compliance score92% · 105 clauses assessed
Our software

An operations platform we built ourselves.

We do not run your contracts on spreadsheets and chat groups. We built a platform that documents every contract, visit and report — and gives you a portal to see the status of each branch at any time.

  • ◆Electronically signed contractsEach signature stored with a verifiable digital fingerprint.
  • ◆Photo-documented visitsBefore and after, time and location stamped — not just “visit completed”.
  • ◆Reports delivered automaticallyTo the owner by email and WhatsApp, without being requested.
  • ◆A portal per branchContracts, visits and reports in one place.
Enter the platform →
Facility dashboard · Dammam branch
Annual maintenance contractSigned electronically · renews in 62 days Active
Scheduled visit · 24 camerasDocumented with before/after photos Completed
AB-570 readiness reportAwaiting owner approval In review
Branch readiness78%
Who we serve

Five segments — each with its own language.

A homeowner, a shop owner and a plant manager do not ask the same question, so it would be wrong to answer them the same way.

Homes & Individuals

Villas, apartments and farms — first-fix before finishing, surveillance and network coverage across every floor.

Shops & Commercial

Licence readiness, retail-specific camera design, and one portal to track every branch.

Companies & Industrial

One integrated system, one contract, one accountable party — with documented engineering deliverables.

Contractors & Consultants

We take the low-current package: drawings, specifications, bills of quantities and a handover file for the consultant.

Government & Facilities

Delivery through an accredited establishment, with auditable documents and a verifiable visit record.

Is your licence waiting on a compliance certificate?

Have your facility assessed at no cost. We send you a report showing which clauses are met and exactly what is missing — before the official inspection, not after it.

Start the free assessment → How it works